N-2200 Portable Site Layout & Setup and Training

N-2200 Portable Site Layout
Site Preparation

Customer must have the following ready at the time of installation:

  • Plants work best when they are mounted on a concrete slab.​
  • Electric power must be ready at the site at the time of installation.
  • Water must be ready at the site with a line to connect to the plant; maximum pressure 75 PSI.​
Electric Power

Important Note: You need 1 1/2 times the current draw of the motor size for starting purposes.

Batch Plants
  • 60 HP – 75 HP
  • 480 Volts, 3 phase, 80 – 100 amps
  • 120 Volts, single phase, 20 amps​
Site Layout Drawing

Follow the site layout drawing carefully as provided in the installation documents for the specific plant model.​

Set-up & Training

Set-up and training is included in the price of the plant. Customer must pay airfare and provide decent hotel and transportation while set-up and training is in process. Customer will provide all items listed in the Installation Agreement (attached). Customer pays electrician, scale calibration & hook-up, two men and equipment for assembly as needed.