Site Preparation
Customer must have the following ready at the time of installation:
- Plants work best when they are mounted on a concrete slab.
- Electric power must be ready at the site at the time of installation.
- Water must be ready at the site with a line to connect to the plant; maximum pressure 75 PSI.
Electric Power
Important note: You need 1½ times the current draw of the motor size for starting purposes.
Batch Plants
- 60 HP – 75 HP
- 480 volts, 3 phase, 80–100 amps
- 120 volts, single phase, 20 amps
Site Layout Drawing
Follow the site layout drawing carefully as provided in the installation documents for the specific plant model.
Set-up & Training
Set-up and training are included in the price of the plant. The customer must pay airfare and provide a decent hotel and transportation while set-up and training are in process. The customer will provide all items listed in the Installation Agreement (attached). The customer also pays for the electrician, scale calibration and hook-up, and two men with equipment for assembly as needed.