Simple • Dependable • Innovative
Call Us (877) 297-5454
(916) 205-1430 Cell • Felesta Smith
Free Trip to Our Factory • Airfare & Hotel • Call for Details

Site Layout & Setup and Training

Site Preparation

(Customer must have the following ready at time of installation)

  • Plants work best if they are mounted to a concrete slab.

  • Electric power must be ready at the site at time of installation

  • Water must be ready at the site with line to hook to plant maximum psi 75

Electric Power

Important Note: You need 1 1/2 times the current draw of the motor size for starting purposes

Batch Plants

  • 40 HP - 50 HP

  • 480 Volts, 3 phase, 50 amps

  • 120 Volts, single phase, 20 amps

Site Layout Drawing

Follow Carefully (Click above image or here for details)

Set-up & Training

Set-up and training is included in the price of the plant. Customer must pay airfare and provide decent hotel and transportation while set-up and training is in process. Customer will provide all items listed in the Installation Agreement (attached). Customer pays electrician, scale calibration & hook-up, two men and equipment for assembly as needed.